Emission-free construction in urban areas requires reliable energy

Crane company Van Straaten opts for emission-free mobile energy supply from Emolith

The construction sector is in the middle of a huge transition. Local authorities are imposing increasingly strict requirements regarding nitrogen reduction and CO₂ control, especially at construction sites in urban areas and near nature-sensitive zones. For contractors and construction companies, this means: traditional diesel generators are giving way to clean, electric alternatives.

Van Straaten Group, a leading player in civil construction and infrastructure, faced exactly this challenge. The use of their electric cranes required a powerful, flexible energy source that fully fits within the emission-free construction requirements.

The challenge: energy supply without emissions

In several projects, Van Straaten had to deal with permit conditions that explicitly stated:

  • Limitation of nitrogen emissions (NOx)
  • CO₂ reduction on construction sites
  • Emission-free solutions in inner-city environments
  • Low-noise deployment of equipment

To make the most of their electric cranes, it was necessary to find a mobile energy supply that is both technically reliable and future-proof.

Result: future-proof and permit-proof construction

The cooperation has led to direct benefits for project implementation: a

  • Fully emission-free energy supply on location
  • Less impact on the environment and air quality
  • Faster acceptance by local authorities
  • Reliable operation for heavy electrical equipment

Van Straaten can therefore carry out emission-free construction projects without making concessions to power or continuity.

Experience of Van Straaten

“For our electric cranes we needed a reliable mobile energy solution that meets the increasingly stringent requirements of municipalities and provinces surrounding nitrogen and CO₂ reduction on construction sites. Emolith's mobile energy supply fits in perfectly with this. The system runs stably, is easy to use and fits perfectly within our emission-free construction strategy in urban areas.”

“In addition, we are particularly satisfied with Edwin's guidance and support at Emolith, everything was arranged professionally and quickly from purchase to commissioning.”
Michel van Straaten, CEO, Van Straaten Group
https://www.van-straaten.nl/